HOW WE INSTALL ON YOUR ROOF

FIRST, WE LOCATE THE TRUSS AND DRILL A PILOT HOLE

WE THEN PUT SILICONE INTO THE HOLE

AN ELEVATED PLATFORM DIVERTS WATER AWAY, WHILE A STACK OF RUGGED COMPONENTS RAISES THE SEAL AN ENTIRE INCH

 THE 7" LAG SCREW HAS SILICONE SEALS AND WHEN DRIVEN DOWN, CREATES AN EVEN STRONGER SEAL

THE LAG SCREW IS DRIVEN DOWN, CREATING AN EVEN TIGHTER SEAL

THE CAP IS SCREWED ON PROVIDING AN EXTRA MEASURE OF WATER PROOFING

THE  RACKING IS INSTALLED , USING THE SLOTTED CAPS TO TAKE OUT ANY ROOF VARIASTIONS

THE SOLAREDGE POWER OPTIMIZER IS A DC/DC CONVERTER WHICH IS CONNECTED BY INSTALLERS TO EACH SOLAR MODULE TURNING THEM INTO SMART MODULES. THE SOLAREDGE POWER OPTIMIZERS INCREASE ENERGY OUTPUT FROM PV SYSTEMS BY CONSTANTLY TRACKING THE MAXIMUM POWER POINT (MPPT) OF EACH MODULE INDIVIDUALLY. FURTHERMORE, THE POWER OPTIMIZERS MONITOR THE PERFORMANCE OF EACH MODULE AND COMMUNICATE PERFORMANCE DATA TO THE SOLAREDGE MONITORING PLATFORM FOR ENHANCED, COST-EFFECTIVE MODULE-LEVEL MAINTENANCE

EACH SOLAR PANEL GETS ONE OPTIMIZER

THE PANELS ARE STAGED AND READY FOR INSTALLATION

THE "T" BOLT HOLDS THE PANEL IN PLACE

SOLAR PANELS ARE COMPLETE. BY USING THE SLOTTED CAPS, ANY VARIATION IN THE ROOF IS MITIGATED , GIVING A CLEAN AND FLAT  LOOK

For wire management, when possible we prefer to run the wires through the "SolaDeck" junction box.

 

Finishing with the Inverter, Rapid Shut-down, and Production Meter

PVA-032018-021117

top100_all_time-38f9c8b0_edited.png
MnSEIA%20Logo_edited.png
mrealogoname-14.jpg
google-5-stars-reviews-png-11_edited.png
  • Facebook
  • Solar Reviews Logo
  • Instagram

Copyright 2020 © MN Solar